Work consisted of clearing portions of right of way, and installation of 6-inch base material. Ditch/crown roadway and subgrade preparation were completed, and five culverts were installed.
9 Acre Lake
CLIENT Private Property
TIME FRAME 2.5 months
AREA 250 acres
This project was completed after an initial layout and design with client, who wanted a fish habitat. The Adams team consulted with a fish biologist to create the perfect environment. After site clearing, the lake was constructed, including a dam, overflow pipe, and an emergency spillway.
After the project settled, the pond and surrounding areas were seeded and fertilized.
Business Park
PROJECT TYPE Commercial
AREA 4.9 Acres
For this business park, work comprised of on-site cut/fill, subgrade lime stabilization, and import of selected fill fur building pads. Afterward, Adams finished grading the site. Features included a 1 acre detention pond and 1600 feet of storm drainage.
Saw Mill Addition
CLIENT Industrial
TIME FRAME 1.5 months
AREA 82,500 Sq. ft. pad / 68,000 paved
After onsite cut/fill, the Adams team completed land installations of an 82,000 square foot building pad, 68,000 square feet of surrounding paved areas, and 530 feet of storm drainage. Lastly, the site was finish-graded.